Performance

Iris limits work that can grow without corresponding input. Two work budgets count operations defined by the Specification, independently of elapsed time and of how an implementation allocates memory. Each applies to a whole read or catalog operation.

Let N be the entire original input’s byte length, including comments and bytes after a stop or selected instance. Each operation starts with these limits:

Work Limit Examples of charged work
Idle 1048576 Counted repeat iterations that read no input; empty array rows
Expression 1048576 + 16 × N Aggregate leaves, array and record selections, comprehension visits, lifted-check rows

Reaching a limit exactly is allowed; exceeding either one reports E-BUDGET. The counters do not reset when a repeat ends, input advances or an instance is skipped. A catalog shares them across all its instances. Reader-spec bytes and parameter strings do not add to N. iris check executes neither budget.

The Specification defines counters and input length and expression charges.

A zero-width array can still require many outer rows. This reader uses a parameter to choose how many empty rows to construct:

site/examples/guides/empty-rows.iris
param rows = 3
empty[rows][0]: int

Its input file is empty; no tokens are needed:

Empty file.

Terminal window
iris read site/examples/guides/empty-rows.iris site/examples/guides/empty.txt --dzn
rows = 3;
empty = array2d(1..3, 1..0, []);

empty[rows][0] adds rows idle units before constructing the empty structure. Increasing only the parameter exceeds the allowance, even with zero input:

Terminal window
iris read site/examples/guides/empty-rows.iris site/examples/guides/empty.txt --dzn --param rows=1048577
site/examples/guides/empty.txt:1:1: too many repetitions or empty rows without reading input
     1 | 
       | ^
while reading: empty
spec: site/examples/guides/empty-rows.iris:2

The failure happens at the array declaration. It is a work limit, not a memory allocation failure and not a timeout. The exact empty-array charges are in idle work, and diagnostic locations are in exhaustion.

Use counted repeats when the input supplies a count, and token or EOF repeats when the input supplies a terminator. An indefinite repeat or instance body that consumes no input reports E-NO-PROGRESS, separately from the idle budget.

Use distinct to test uniqueness rather than comparing every pair in nested comprehensions. Sum a collection once with let when several later checks need the same total. Keep record checks local when their condition concerns one record. The job shop reader shows both a per-job distinct and a single total-duration calculation.

Short circuit can avoid evaluating later expressions. It does not remove the row-selection charges that a lifted check incurs before evaluating its condition. See lifted-check traversal. If a read exhausts a budget, reduce repeated traversal or idle structure creation. Padding the input to raise the limit leaves the underlying work in place.